LOCATION
Sacramento, CA
 
CLIENT
San Juan Unified School District
 
COMPLETION DATE
March 2003
 
SIZE
2,880 s.f.
 
COST
$495,000
 

Ralph Richardson Center
K-12 Special Education
New Classroom Building


The Ralph Richardson Center had been utilizing a relocatable classroom building that had exceeded its usable life to serve the special needs of its students. ImageWorks Architecture was asked by the San Juan Unified School District to design a new permanent facility addressing the current needs of the school.

ImageWorks Architecture worked closely with our client to develop effective design solutions for the needs of district. Through this collaboration, the design developed a practical, durable, and cost-effective solution for the removal of the existing building and construction of the new building.



LOCATION
Sutter, CA
 
CLIENT
Sutter Union High School District
 
COMPLETION DATE
March 2003
 
SIZE
7,200 s.f.
 
COST
$540,000
 

Sutter High School Physical Education and
Theater Arts Rehearsal Buildings


Through private donations and volunteer labor, the Sutter High staff and parents have developed and constructed two new buildings for the Physical Education and Theater Arts Departments.

ImageWorks was contacted by the school in 2001 to work with the school staff and parents to find a viable solution to create space in an overcrowded facility. Modular construction on a concrete slab floor was utilized to provide an economic and practical solution to meet the needs of the learning environment at Sutter High School.

 

  Schools Churches Commercial Residential